Sites ready to build

Matre data center site

Good supply of clean energy, and a short time to market. The site is close to a strong grid connection point and hydro power production, and can hence provide dual feed electrical power at 100 MV.

  • Powersupply: 100 MW
  • Area: 25,000m2
  • Latency: Excellent
  • Time to market: Ready to build
Read more

Dale Data Centre Valley

Shovel-ready sites alongside established data centers. Clean energy supply and good connectivity.

  • Powersupply: 100 MW
  • Area: 50,000m2
  • Latency: Excellent
  • Time to market: Ready to build
Read more

Børdalen data center site

Børdalen is a greenfield data center ready zoned. The site is close to a strong grid connection point and hydro power production, and can hence provide dual feed electrical power at 100 MV.

  • Powersupply: 100 MW
  • Area: 60,000m2
  • Latency: Excellent
  • Time to market: Ready to build
Read more

Skipavika data center site

This data center site is located at the Skipavika Terminal in Gulen, Norway. The site is within an industrial area and has good power connections.

  • Powersupply: 7.5-20MW (22kV)
  • Area: 400,000m2
  • Latency: Excellent
  • Time to market: 10-12 weeks
Read more